14 June 2013

Windowwwwwwws!

The windows are here! AND they're now all installed!! The crew's been installing this week, and since it took me so long to get to writing this post they're now all installed.  We're so excited!  The delivery came at the very end of May.  Frank and I were very busy the last few weekends though, with my half marathon, and traveling up to NJ.  Here's a glance at what the delivery looked like when the windows arrived...



Truck Delivery for the windows and sliding/glass doors!

Stack-o-sliders

Stack-o-windows

Once they all arrived, we had to wait for the window sills to arrive.  Frank and I went with a limestone will, to compliment a few other limestone installations we already had in the house (fireplace, mantle, etc.).  Once those arrived, it was time to install. 

Day 1: The crew installed the two master bathroom windows, and the side breakfast nook/patio door.

Window in mater bathroom from inside.
Side of the house - window in master bathroom from the outside, minus trim at this point.


Exterior view of the new patio/breakfast nook door!
Day 2: The crew moved on to installing the kid's bedroom windows, the breakfast nook back window, and the big front living room window -- that one was a beast!
Kid's bedroom - interior view of windows.
Exterior (front of house) view with two kid's bedroom windows in (far left and middle) and master bathroom window at the far right installed, minus trim.

Breakfast nook area - interior view of patio door and window.

Exterior view - living room "beast" window.

 Day 3: The crew opened up the new window between the kitchen and dining room, installed that new window and installed the dining room window and master bedroom window.
Back of house exterior - you can see where the new window opening is starting to take shape.

Here is the new window all opened up, and the dining room window in the back with the crew.

Interior view from the kitchen - breakfast nook window on the left and new window at the right of this photo.

Interior view from the dining room - new window on the left and dining room window on the right.

Interior view from the breakfast nook - all three windows (new on in the middle).

Day 4: The mancave window went in, as well as the mudroom sliding glass door, and the master bedroom sliding glass door! That's it for getting the windows in place!!
I came home to this! Standing in the breezeway, looking at new slider into mudroom.
Interior view standing in kitchen/living room - mudroom slider and breakfast nook patio door.

Exterior view - master bedroom slider.

View from the back of the house (prior to mancave window install).

So there you have it!  The windows and glass doors are in!  The interior doors arrived this week, along with a few other fixtures.  Things are really moving along here.  Next up, trimming all the windows and moving on to more of the finishing -- installing hardwoods, touch-ups and painting, etc.  Things are looking good for our July finish!

28 February 2013

Man Cave Update!

The Man Cave is still coming right along... Since the last post, we've insulated the room, and also put up the studs for the wall framing.  Here's a look:


We also have the closets framed up.  So now I can go and plan out the closet organizers! FUN!!


We plan to order new closet doors that will be like french doors - so we'll add those after we drywall.  Speaking of drywall, that's soon on the list.  We need to finish up a few things that go through the man cave ceiling up through the kitchen floor still.  Once those things are done, we'll be able to close the walls up in the man cave!  We are also planning to put a rug in here as flooring.  Still have to pick that out as well. 

More updates to come soon hopefully!

04 February 2013

Now that's what you call an "Open Floor Plan!"


This past week was a great one for renovation progress at the house! One big thing that we were able to accomplish was cutting in the mudroom for our side entry.  The mudroom will be sunken below the rest of the main level by a few inches, and will be a tiled space.  We'll have some cubbies and hooks to hang coats, and places for shoes and mail too.  Since the side door is the main way that Frank and I enter, this will be where we put our things mainly as we enter and leave.  Since the mudroom is sunken, we had to do some work down in the man cave as well -- so framing started down there.  Here are a few pictures of how this all went down...

Mudroom cut-in, view from upper level - living room looking back.
 
Mudroom cut-in, view from lower level/man cave.


Sub-floor put into mudroom sunken floor.

Supports and sub-floor installed (from man cave).
Sub-floor installed, another view from top.
Mapping out where things will go with tape, haha!


That's it for now.. check back again soon!

31 January 2013

Man Cave Progress

Not too much that you can see happened since my last post in our temporary master/second master in the future/Man Cave, but I figured I'd post a few pics anyway.  The carpet is now up, and all the tack strips are out.  Electrical work has begun, but is not yet finished.  We're also working on wiring a few walls so they're cable ready.  It's coming along though...

View standing towards front of the house, looking out towards the back.

Opposite view, standing at the back of the house looking towards the front.

Of course Tyson wanted to get in the mix too!  Apparently all this demo and renovating makes him hungry (he's licking his chops in the second picture, haha).

We'll be adding in some insulation and re-framing all of the walls next. Electrical work and wiring also continues.  So, things are moving along here too!

31 December 2012

The Bat Cave... I mean, Man Cave

Demo at the Prihoda residence has begun!  Right before heading up to NJ for Christmas, we started tearing down walls. Our demo started downstairs, which allowed us to do a few last things that would make the lower level fully liveable for a few months while we totally renovated the upper/main level. 

We had to tackle the back two rooms first (lower level) so that we could also accomodate the new mudroom we're adding for our side entrance (where we enter from the garage upstairs). We'll need to add in some in-floor support, so tearing down the ceiling in the lower level rooms was the best way to do that at this point.

While tearing down the back two rooms, we discussed plans of what we wanted to do with the space. When we first finish this newly expanded room, we're going to move in and make it our (2nd) temporary master bedroom.  There's also a bathroom attached, and we're planning to hopefully tackle at the same time.  This way, we'll have a nice clean suite to escape to from all the work that will be underway upstairs. 

Once the upstairs renovations are finished and we move into our real master bedroom, we're planning to make that back room downstairs a "man cave" for the man of the house -- Tyson! Haha, no I'm just kidding.  It will be Frank's man cave of course!  We have decided exactly what will go in there furniture wise just yet, but we'll defintely include a TV and possibly a pull-out couch for extra guests (in additional to a traditional guest room).

It's exciting to see progress in the renovation! Things are really coming along... here are some photos from the demo in the back two rooms (so far)...

Lots of drywall coming down in there!

Drywall aftermath.

More progress! We made it down to the cinderblock and cleaned up that big mess...

Ceiling is out now too... just about done with demo in here.

Once we take up the carpet we'll be just about finished with demo in here.  Then we'll move onto rewiring, replacing the window (to a more energy efficient one), replacing the flooring, dry locking the cinder, adding back walls, painting and decorating!  I'll keep you posted as this room evolves, but so far, so good in here!