Time for a Hall Bathroom update! The Hall Bath is the main level's main bathroom for the main living area. It's also attached to the second bedroom on the main level, with a pocket door. In this room, we decided to open up the space by adding a clear glass standing shower, as opposed to the opaque shower that was there before. We also reduced the size of the vanity that was in there previously, again to add to the open space and "less cramped" feel. Here's a photo of the first steps towards a finish product...
|
Tile going in - shower and on the floor. |
Fast forward to the tile install finishing, and we're up to paint! For this room, I wanted to keep it light and bright (again to make it feel larger), so I went with a lighter paint color in addition the white tile on the wall. "Tradewind" is the name of the shade of blue we chose to go with (hence the "Blue" reference in the post title). here's a look at how things started to come together with some paint on the walls...
|
Hall Bath with tile finished, grout done, and paint on the wall! (Keep in mind there's still a horrid yellow light bulb in there.) |
|
Now that the paint was up and the tile was finished, it was time to install the toilet, vanity and shower glass walls. Flash forward again to having all those things installed!
|
Vanity now in place! |
|
Toilet and Glass Shower Walls/Door installed! |
You can definitely see the difference in paint color with the light turned off in the bottom two photos as opposed to the one up above that had the yellow overhead light on.
Here's on more look at the bathroom in it's almost finished state!
|
Again, the paint changes with the lights on. |
|
So that's where things stand for now. There's still odds and ends to finish in this room, but as you can see it's really starting to come together - Wah Hoo!